1-5 June
In this week I continued with hair keys to some shots along with inbetweening. At the end of this week I moved on to just inbetweening as we had a discussion that there was no point in doing the hair keys to shots that hadn't been inbetweened as the hair keys will become affected (and this DID happen in some shots). I became unhappy about this as I did spend two weeks working on hair but I managed to make up for lost time with completing what was needed to.
I did some back tracking and found posts of the shots I worked on in this week.
Thursday, 30 July 2015
Wednesday, 29 July 2015
Term 2 - Week 5
25-29 May
According to the schedule, I was working on both keyed animation along with inbetweening. I was working on the inbetweens for my shots as well as adding hair keys to the dream catcher in other shots as my group really liked the way the hair turned out.
I remember objecting to this idea because the dream catcher hadn't been inbetweened yet. However I went along with it as it was insisted by the group.
I did the hair keys on these shots:
Scene 01 - Shot 3, 5, 6 and 19.
Scene 02 - Shot 11, 17, 23, 24, 32, 33 and 34.
According to the schedule, I was working on both keyed animation along with inbetweening. I was working on the inbetweens for my shots as well as adding hair keys to the dream catcher in other shots as my group really liked the way the hair turned out.
I remember objecting to this idea because the dream catcher hadn't been inbetweened yet. However I went along with it as it was insisted by the group.
I did the hair keys on these shots:
Scene 01 - Shot 3, 5, 6 and 19.
Scene 02 - Shot 11, 17, 23, 24, 32, 33 and 34.
Term 2 - Week 4
18-22 May
The week of 11-17 May was the due date for the key animation on the 2D side of the project. The shots that I assigned myself to were mostly completed; only had two more shots to finish. What these shots were I do not remember but I do have a list of the shots I have keyed within the three weeks they were assigned.
The week of 18-22 I had finished the remaining shots I needed to complete. At this time I also started inbetweening my shots while helping the rest of my group finish their shots that still needed to be keyed.
Here is a list of shots that I keyed myself:
Scene 01 - Shot 18 and 19.
Scene 02 - Shot 09, 11, 23, 24, 32, 33 and 34.
Some shots had to be removed that are no longer on this list.
The week of 11-17 May was the due date for the key animation on the 2D side of the project. The shots that I assigned myself to were mostly completed; only had two more shots to finish. What these shots were I do not remember but I do have a list of the shots I have keyed within the three weeks they were assigned.
The week of 18-22 I had finished the remaining shots I needed to complete. At this time I also started inbetweening my shots while helping the rest of my group finish their shots that still needed to be keyed.
Here is a list of shots that I keyed myself:
Scene 01 - Shot 18 and 19.
Scene 02 - Shot 09, 11, 23, 24, 32, 33 and 34.
Some shots had to be removed that are no longer on this list.
Time to UPDATE!~
Since I am behind in my blog updates I have been asked to update in order to pass my group project this year. I do not remember when I had done this or that but I am going to try and figure this out.
This is a small post but I feel I needed to post it so I can get into the mood of writing posts again.
This is a small post but I feel I needed to post it so I can get into the mood of writing posts again.